Skip to content

[Build][Compliance] Add temporary suppression rules for BinSkim BA2008 and BA2024 issues on the Foundation repo#6065

Draft
alexlamtest wants to merge 4 commits intomainfrom
user/alexlam/60319197-main-20261207
Draft

[Build][Compliance] Add temporary suppression rules for BinSkim BA2008 and BA2024 issues on the Foundation repo#6065
alexlamtest wants to merge 4 commits intomainfrom
user/alexlam/60319197-main-20261207

Conversation

@alexlamtest
Copy link
Contributor

A microsoft employee must use /azp run to validate using the pipelines below.

WARNING:
Comments made by azure-pipelines bot maybe inaccurate.
Please see pipeline link to verify that the build is being ran.

For status checks on the main branch, please use TransportPackage-Foundation-PR
(https://microsoft.visualstudio.com/ProjectReunion/_build?definitionId=81063&_a=summary)
and run the build against your PR branch with the default parameters.

@alexlamtest
Copy link
Contributor Author

/azp run

@azure-pipelines
Copy link

Azure Pipelines successfully started running 1 pipeline(s).

@alexlamtest
Copy link
Contributor Author

/azp run

@azure-pipelines
Copy link

Azure Pipelines successfully started running 1 pipeline(s).

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant