Skip to content

chore: Upgrade gh-aw workflow and regenerate lock files#4542

Merged
dbrattli merged 1 commit intomainfrom
chore/gh-aw-upgrade-0.25.13
Apr 17, 2026
Merged

chore: Upgrade gh-aw workflow and regenerate lock files#4542
dbrattli merged 1 commit intomainfrom
chore/gh-aw-upgrade-0.25.13

Conversation

@dbrattli
Copy link
Copy Markdown
Collaborator

Summary

  • Ran gh aw upgrade — bumps the upstream githubnext/agentics repo-assist template to SHA 8f2d44f5 and picks up new template options (checkout, messages footer/run-status, protected-files: fallback-to-issue, min-integrity: none).
  • Bumps pinned action versions: actions/github-script v8 → v9, github/gh-aw-actions/setup → v0.68.3 / v0.68.7, github/gh-aw/actions/setup → v0.68.7.
  • Regenerates repo-assist.lock.yml.
  • Resolved a three-way conflict on the schedule: field — kept the local every 24h override from Change repo-assist schedule from 12h to 24h #4433 (upstream moved to every 12h).

Test plan

  • GitHub Actions validates the regenerated repo-assist.lock.yml
  • Next scheduled repo-assist run succeeds on the new template

Ran `gh aw upgrade`, which bumped the upstream `githubnext/agentics`
repo-assist template and the pinned action versions
(`actions/github-script` v8 → v9, `gh-aw-actions/setup` to v0.68.7).

Kept local `every 24h` schedule override from #4433 during three-way
merge (upstream moved to 12h).
@dbrattli dbrattli merged commit 8f2af21 into main Apr 17, 2026
30 checks passed
@dbrattli dbrattli deleted the chore/gh-aw-upgrade-0.25.13 branch April 17, 2026 15:18
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant